Enbridge Pipelines (Texas Gathering), LP
Location: Texas Description: Complete project management services including design, drafting, material/equipment specifications, construction management and field inspection for numerous natural gas pipeline facility ventures. Projects consisted of the following: installation of 7 compressor units, separation and dehydration facilities for grassroots station (60 mmscfd thru-put); installation of 5 compressor units, separation and dehydration facilities for grassroots station (30 mmscfd thru-put); installation of 1 compressor unit and dehydration facilities for expansion to existing facilities (10 mmscfd thru-put); and meter/regulator station including gas chromatograph and communication equipment for interconnecting sales point. |
|
||||||||||||
|
|
|
||||||||||||
|
|
|
||||||||||||
|
|
|
||||||||||||
|
|
|
||||||||||||
|
|
|
||||||||||||
|
|
|
||||||||||||
|
|
Enbridge Pipelines (Ala-Tenn), LLC
Location: Alabama Description: Provide design and drafting services for operational and maintenance projects on existing natural gas pipeline meter and regulator stations. Provide technical assistance and calculations for the lowering of existing loaded pipeline. Perform a complete review of system requirements. Upgrade facilities to meet industry codes and standards, as well as, assist with assessment of pipeline integrity requirements. Provide budgetary cost estimates to meet system improvements. |
|
|||||||||||
|
|
|
||||||||||||
|
|
|
||||||||||||
![]() |
|
||||||||||||
|
|
|
||||||||||||
|
Enbridge Pipelines (KPC)
Location: Kansas Description: Provide technical assistance and proposal preparation for natural gas pipeline delivery interconnects, pipeline lowering projects and pipeline maintenance activities. |
|
||||||||||||
|
|
|
||||||||||||
|
Kerns Oil & Gas, Inc.
Location: Texas Description: Complete design and project/construction management services on a 50 mile gathering and transmission pipeline system. Facilities included dehydration, compression, field measurement and custody transfer. Services included permitting, surveying, engineering, drafting, procurement and construction management for pipelines, station, metering and sales facilities. |
|
||||||||||||
![]() |
|
||||||||||||
|
|
|
||||||||||||
|
North Carolina Natural Gas
Location: North Carolina Description: Complete design and project management services on several metering and regulating stations serving natural gas fired generator stations. Services included multi-discipline engineering, engineering, drafting, procurement and construction management. |
|
||||||||||||
|
|
|
||||||||||||
|
Delhi Gas Pipeline Corporation (Acquired by Koch Industries)
Locations: Oklahoma, Texas and Mississippi Description: Pipeline design and engineering, drafting and construction inspection for numerous natural gas pipeline projects including compression, separation and dehydration facilities. Additional services included survey of the right-of-way and preparation of the as-built drawings for inclusion in the job books. Pipeline diameters ranged from 4" to 24". |
|
||||||||||||
|
|
|
||||||||||||
|
Eastern Shore Natural Gas Corporation
Locations: Pennsylvania, Delaware, Maryland and Florida Description: Right-of-Way acquisition, survey, engineering, drafting and inspection for the pipeline and the compression stations. Utilized CADD for preparation of property plats and alignment sheets. |
|
||||||||||||
|
|
|
||||||||||||
|
Gulf Gas Utilities Company
Locations: Texas and New Mexico Description: Complete design and project management services on several pipeline projects. Services included right-of-way acquisition, permitting, surveying, engineering, drafting, procurement and construction management for pipelines, metering and sales facilities. |
|
||||||||||||
|
|
|
||||||||||||
|
Maersk Energy Inc.
Location: Texas Description: Pipeline right-of-way survey, design and engineering, drafting, construction inspection, and as-built records for several natural gas pipeline projects including compression, separation, CO2 removal and dehydration facilities. Pipeline diameters range from 3" to 12". |
|
||||||||||||
|
|
|
||||||||||||
|
Red River Gas Pipeline Corporation
Location: Texas Description: Engineering, drafting and construction inspection services for installation of 16" and 10" orifice metering facilities. |
|
||||||||||||
|
|
|
||||||||||||
|
Paragon Engineering Services Incorporated
Locations: Texas and Ecuador Description: As a subcontractor to the client, provided technical and field assistance for an oil pipeline and flowlines collection system for Occidental Exploration and Production Company. The project location was Block 15 in the Oriente region of Ecuador. Technical services provided included final engineering of the pipeline and flowlines, preparation of the material specifications and take-off, and preparation of the related construction bid documents. Field assistance services included a site visit, final pipeline and flowline route selection, and interview and qualification of local potential pipeline construction contractors. |
|
||||||||||||
|
|
|
||||||||||||
|
Basic Resources International
Location: Guatemala Description: Complete project management and engineering services for heavy crude oil gathering/treating facility and 175 miles of 12" diameter export pipeline including hydraulic studies, process simulation, pipe and material specification, pipeline and pump station design, and communications. Station facilities included gathering, separation, sweetening, stabilization, storage, pumping and power generation. |
|
||||||||||||
|
|
|
||||||||||||
|
Falcon Seaboard Oil Company
Location: Texas Description: Complete design and project management services for 10" pipeline interconnection. Also right-of-way acquisition, survey, permitting, design, drafting and inspection for a 40 mile, 12" diameter natural gas pipeline. |
|
||||||||||||
|
|
|
||||||||||||
|
Location: Texas
Description: Process design, detail engineering and design services for natural gas processing plants fabricated for installation in South America. Facilities included power generation, turbo expanders, process, compression, controls and remote monitoring. |
|
||||||||||||
|
|
|
||||||||||||
|
Laredo Nueces Pipeline Company
Location: Texas Description: Design and construction management services for 11 miles of 8" gas gathering pipelines and 17 miles of 12" sales pipeline including preparation of construction bid package and contractor selection, construction permits acquisition, construction management and inspection, materials coordination, acceptance testing, and preparation of the as-built job data books. |
|
||||||||||||
|
|
|
||||||||||||
|
United Parcel Service
Location: Philadelphia International Airport Philadelphia, Pennsylvania Description: Design and field services for the pipeline route survey and location, environmental studies of the wetland areas along the pipeline route, and preparation of the construction bid package for 5900 ft. of 12" pipeline. The pipeline transports aviation fuel between the existing fuel terminal and the new construction bottom loading facility for aviation refuelers. |
|
||||||||||||
|
|
|
||||||||||||
|
OCT Energy, Inc.
Location: Texas Description: Engineering, surveying and drafting for several pipeline projects. |
|
||||||||||||
|
|
|
||||||||||||
|
ABB Randall Corporation
Locations: Texas and Pakistan Description: As a subcontractor to the client, provided technical and field assistance during the turn-key proposal preparation for a gas and gas condensate pipeline gathering system, trunkline and gas process plant for Oil & Gas Development Corp. of Pakistan. The project location was the Dhodak Field in Pakistan. Technical services included preliminary engineering of the pipeline gathering system, pipeline manifold, trunkline and the slug catcher to be located at the gas process plant. Field assistance services included site visit, pipeline route selection evaluation, construction difficulty assessment, and interview and evaluation of local potential pipeline construction contractors. |
|
||||||||||||
![]() |
|
||||||||||||
|
|
|
|||||||||||
|
|
|
||||||||||||
|
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
||